Home renovation: where to start
Do you have a new home in Melbourne or another community? Dreaming to equip it to your taste, but do not know where to start the repair? To make it easier for you to cope with this task, let’s figure out how to better organize the repair in a new house or a secondary house, taking into account the nuances of these two different types of real estate.
Stages of repairing a new home
A new cottage can be repaired much faster than a secondary property. If it has been delivered to you with a finish, you can limit yourself to checking the communications in it, as well as the state of the finish. In some cases, you may have to change some types of coatings, such as wallpaper or flooring. However, this work usually does not take much time.
If the house was delivered with rough finishing, the work will have to approach the capital.
Initially, a house renovations of new housing is created, an estimate of future repairs is made. If by this time the house has already installed new windows or flooring, these elements should be covered with plastic wrap, so as not to spoil them during the subsequent work.
At the next stage is the drilling out of walls for communications. When performing this part of the work is required to take into account the subtleties of the location of outlets and lighting devices throughout the house, as in the future to move them will be extremely difficult.
Next, new windows are installed (if necessary). After that, you can finish the ceiling. If you plan to install suspended structures, postpone their installation to the time when the wallpaper in the room will already be pasted.
The next stage, which provides for the overhaul of the house – finishing the walls. It provides for the alignment of surfaces, the application of primer, followed by puttying.
Next you can perform screeding of the floor. Use for this is best self-levelling mixtures – with them it is easier to get the desired result at first time, even if you have absolutely no experience in such work.
At the last stage, install the final coating of walls (wallpaper, tile, paint), as well as the floor. Only at the final stage you can install interior doors, casings and thresholds, as well as install outlets and switches.
If we talk about the order in which to equip the different rooms of your home renovations Melbourne project, then it is recommended to start with the bathroom, kitchen (because here most of the dirty work), as well as non-passable rooms. The last thing you will need to do is the corridor and passageways, as there is a very high risk of spoiling the finish in these parts of the house, carrying out repairs in remote rooms.
How to repair a secondary home
If you received a secondary home, the repair in it should be treated no less carefully than the arrangement of a new construction. Step by step it will be necessary to act as follows:
Initially, you will need to check the state of plumbing and communications, as well as the general state of the supporting structures and the basement. If they are in satisfactory condition, you can proceed to further stages of work. If not, these parts of the house should be dealt with first. Also at this stage of the work you need to determine what areas will be affected by the repair, and what not.
The next step is to prepare for the work itself, the dismantling of old coatings, plumbing (if required). Tape the windows, doors, floors with polyethylene in those places where repairs will not be carried out.
Next, you will need to replace the communications (if necessary) and plumbing. If there is a need, at this stage, you can also do remodeling and replacement of windows.
The next step is finishing the ceiling and walls, leveling the floor (if required).
Only at the last stage do the finishing of the ceiling, then the walls and floor. As with new housing, the last step is the installation of interior doors and casings.
Speaking of what to start the repair of a private house, in this case it is also advisable to recommend to work from the kitchen and distant rooms to the pass-through part. The same rooms that you are not going to repair, during the repair is better not to use (if you do not live in the house), so as not to spoil the finish here.